Just attempted SSC CGL 2021 Tier-I (HO 21/04/2022 S-3) Test Scored::47.5/ 200 Test listTake Test
Ytube Answers
A and B working alone can complete a work in 8 days and 12 days, respectively. They started working together, but A left 2 days before completion of the work. In how many days was the work completed?
Two person P and Q are 844 m apart. They both start cycling simultaneously in the same direction with speeds of 12 m/s and 8 m/s, respectively, In how much time will P overtake Q?
A is as efficient as B and C together. Working together A and B can complete a work in 36 days and C alone can complete it in 60 days. A and C work together for 10 days, then B alone will complete the remaining work in :
If the simple interest on a certain sum of money borrowed for 4 years at 9.5% per annum exceeds the simple interest on the same sum for 3 years at 12.5% per annum by Rs. 225, then the sum borrowed is:
A tower standing on a horizontal plane subtends a certain angle at a point 160 m apart from the foot of the tower. On advancing 100 m towards it, the tower is found to subtend an angle twice as before. The height of the tower is