Score Khel Tests Quiz Questions Papers Courses Typing Lectures Login
Hindi Version of the Ques with Green background are available only
SSC Selection Post Matric 2022 objective Ques (19 results)
1)

P, Q and R together can do a piece of work in 56 days. P and Q together can do one-fourth as much work as R alone. In how many days can P and Q together complete the entire work?

, Avg: 01:00 , 60% SSC Selection Post Matric 2022
A)

70

B)

140

C)

210

D)

280

2)

Three men do as much work as 4 boys do and the 4 boys can together complete work in 21 days. In how many days will 9 men and 2 boys complete the same work?

, Avg: 01:19 , 80% SSC Selection Post Matric 2022
A)

6

B)

7

C)

8

D)

11

3)

A, B and C can do one-third of a work in 15 days, 30 days and 10 days, respectively. A started the work. C joined him after 1 day and B joined them after 3 days of the beginning. For how many days did C work?

, Avg: 02:08 , 20% SSC Selection Post Matric 2022
A)

20

B)

15

C)

16

D)

13

4)

A is 40% more efficient than B. If B finishes a work in 14 days , then in how many days will A finish the same work?

, Avg: 00:54 , 85% SSC Selection Post Matric 2022
A)

9

B)

8.4

C)

10.5

D)

10

5)

A earns ₹2,250 in a day if he works for 8 hours a day. B earns ₹3,750 per day if he works for 6 hours a day. The ratio of the per hour wages of A to that of B is:

, Avg: 01:58 , 100% SSC Selection Post Matric 2022
A)

9 : 20

B)

11 : 17

C)

15 : 28

D)

7 : 19

6)

A and B can do a piece of work in 24 days and 48 days, respectively. Working together, they completed the work in 12 days with the help of C. How long (in days) will C take to do five-sixth of the work all by himself?

, Avg: 01:00 , 83% SSC Selection Post Matric 2022
A)

36

B)

54

C)

48

D)

40

7)

A can do a work in 10 days. He worked for 6 days and left the work. The remaining work was done by B in 8 days. In how many days can B alone do 65% of the work?

, Avg: 00:48 , 75% SSC Selection Post Matric 2022
A)

13.5

B)

12

C)

13

D)

14

8)

A and B together can do a work in 16 days. If A alone can do the same work in 48 days, then in how many days can B alone do the same work?

, Avg: 00:20 , 100% SSC Selection Post Matric 2022
A)

20

B)

12

C)

24

D)

16

9)

P can do a piece of work in 48 days and Q and do half of the same work in 30 days. If they both work together, in how many days can they complete three - eigth of the work?

, Avg: 00:59 , 66% SSC Selection Post Matric 2022
A)

24

B)

10

C)

8

D)

12

10)

P sold a camera to Q at 32% profit. However, Q sold it to R at a loss of 20% . If R paid Rs.6,464 for the camera, what was the price (in Rs, to the nearest rupee) paid by P for it?

SSC Selection Post Matric 2022
A)

5,850

B)

8,050

C)

7,080

D)

6,121

showing 1 - 10 results of 19 results