, Avg: 01:40 , 66%✓ SSC CGL 20161)A and B together can do a piece of work in 9 days. If A does thrice the work of B in a given time, the time A alone will take to finish the work is
12 days
, Avg: 00:33 , 50%✓ SSC CGL 20162)In what time will a 100 metre long train running with a speed of 50 km/hr cross a pillar
7.2 sec